Tuesday, 29 September 2015

IDENT- RISK ASSESSMENT

Risk Assessment


No.
Hazard
Existing Control Measure
Risk Rating
1
Obstacles
Always look where you’re walking so you don’t trip over anything.
Medium
2
Being Electrocuted
Dry your hands before touching anything electrical and keep water away from all equipment that uses electrics
High
3
Breaking equipment
Take care when carrying equipment
Low


Risk rating:


High: Current controls totally inadequate with serious consequences, death(s), serious injury, long term illness, health. Or there is a very high probability of the hazard occurring.


Medium: Current controls still poor but consequences less serious: Minor injury, short term ill health with no lasting effects.


Low: Current controls are adequate to minimise the risk so far as reasonably practicable.



This risk assessment for my ident shows all the possible dangers or hazards I will have when filming my ident and the dangers that are included in my ident.

No comments:

Post a Comment